Draft Agenda -- SAS PHY Working Group
March 9, 2010 -- San Jose, CA
Tuesday  9:00 am -- 5:00 pm

1.   Opening Remarks
2.   Attendance
3.   Review of documents and proposals
4.   Old business
4.1    SAS 2.1 letter ballot comment resolution [Cox]
4.2    SAS 2.1 HD Connector pinouts (10-072r0) [Diepenbrock, Butt]
4.3    SAS 2.1 update to Mini SAS HD external cable figures (10-106r1) [Cox]
4.4    SAS-2.1: SCD21 Limit Proposal for Passive Cables (10-008r3) [Rost]
4.5    F/2 Jitter (10-066r0) [Newman]
4.6    SAS-2.1 Technical presentation of effects of changing SCD21SDD21 specification (10-094r0) [Gagnon, Hernandez]
4.7    SAS2.1 SCD21 and Common Mode Tolerance (10-089r0) [Witt & Carrigan]
4.8    SAS 2.1 JTF calibration update [Gagnon]
5.   New business
5.1    SAS 12Gbps Considerations (09-111r0) [Cox, Newman]
5.2    SAS-3 Channel Model Analysis at 12Gb/s (09-327r0) [Newman]
5.3    Crosstalk in Copper Cables - Data Plots (09-376r0) [McGrath]
5.4    SAS 3 Channel Analysis (09-371r2) [Lye]
5.5    ICR Analysis of Channels for SAS-3 (09-395r1) [Witt]
5.6    SAS 3.0 Questions/Recommendations. (09-377r1) [Felton]
5.7    SAS 3.0 channel modeling requirements (10-023r2) [Felton]
5.8    SAS-3 SPL Back Channel (10-025r0) [Newman, Day]
5.9    SPL-2 Backchannel Speed Negotiation (10-090r0) [Day]
5.10   Crosstalk Modeling, Simulations and Measurements for SAS-3 (10-034r1) [Witt & Bari]
5.11   mini SAS HD channel evaluation (10-042r0) [Fromm]
5.12   SAS3 Channel Analysis (10-041r1) [Witt]
5.13   SAS-PHY: Proposed Updates to Section D.10 (Draft) (10-113r0) [Gagnon]
5.14   SAS 3.0 drive connector mated pair requirements (10-123r0) [Cox]
6.   SFF-related
6.1    SAS-3 Channel models Main Description (10-078r0) [Felton]
6.2    SFF-8449 discussion [Olawsky]
6.3    SFF8636 Option #3 EEPROM space (09-398r0) [Felton]
6.4    SAS-2.1, SFF-8636 Draft, Common Memory Map (10-024r0) [Olawsky]
7.   Review of Recommendations
8.   Meeting Schedule