| |||||||||||||||||||||
Draft Agenda -- SAS PHY Working Group March 9, 2010 -- San Jose, CA Tuesday 9:00 am -- 5:00 pm 1. Opening Remarks 2. Attendance 3. Review of documents and proposals 4. Old business 4.1 SAS 2.1 letter ballot comment resolution [Cox] 4.2 SAS 2.1 HD Connector pinouts (10-072r0) [Diepenbrock, Butt] 4.3 SAS 2.1 update to Mini SAS HD external cable figures (10-106r1) [Cox] 4.4 SAS-2.1: SCD21 Limit Proposal for Passive Cables (10-008r3) [Rost] 4.5 F/2 Jitter (10-066r0) [Newman] 4.6 SAS-2.1 Technical presentation of effects of changing SCD21SDD21 specification (10-094r0) [Gagnon, Hernandez] 4.7 SAS2.1 SCD21 and Common Mode Tolerance (10-089r0) [Witt & Carrigan] 4.8 SAS 2.1 JTF calibration update [Gagnon] 5. New business 5.1 SAS 12Gbps Considerations (09-111r0) [Cox, Newman] 5.2 SAS-3 Channel Model Analysis at 12Gb/s (09-327r0) [Newman] 5.3 Crosstalk in Copper Cables - Data Plots (09-376r0) [McGrath] 5.4 SAS 3 Channel Analysis (09-371r2) [Lye] 5.5 ICR Analysis of Channels for SAS-3 (09-395r1) [Witt] 5.6 SAS 3.0 Questions/Recommendations. (09-377r1) [Felton] 5.7 SAS 3.0 channel modeling requirements (10-023r2) [Felton] 5.8 SAS-3 SPL Back Channel (10-025r0) [Newman, Day] 5.9 SPL-2 Backchannel Speed Negotiation (10-090r0) [Day] 5.10 Crosstalk Modeling, Simulations and Measurements for SAS-3 (10-034r1) [Witt & Bari] 5.11 mini SAS HD channel evaluation (10-042r0) [Fromm] 5.12 SAS3 Channel Analysis (10-041r1) [Witt] 5.13 SAS-PHY: Proposed Updates to Section D.10 (Draft) (10-113r0) [Gagnon] 5.14 SAS 3.0 drive connector mated pair requirements (10-123r0) [Cox] 6. SFF-related 6.1 SAS-3 Channel models Main Description (10-078r0) [Felton] 6.2 SFF-8449 discussion [Olawsky] 6.3 SFF8636 Option #3 EEPROM space (09-398r0) [Felton] 6.4 SAS-2.1, SFF-8636 Draft, Common Memory Map (10-024r0) [Olawsky] 7. Review of Recommendations 8. Meeting Schedule |
|||||||||||||||||||||