Date: July 16,1992 X3T9.2/92-155 Rev 0 To: X3T9.2 Committee (SCSI) From: Claude Mosley (IBM) George Penokie (IBM) Subject: Connector Requirements The P-connector system shall be a multi-wipe design with contact geometry and normal force sufficient to pass the following test: 1-Measure contact resistances of the connectors being evaluated using a test procedure for low level contact resistance. Use EIA 364-23A (Low Level Contact Resistance Test Procedure For Electronic Connectors) as a reference procedure. Record measurements as initial contact resistances. 2-Unmate and mate connectors 50 cycles. 3-Remeasure contact resistances as per step 1 (optional. | 4-Expose mated connectors to mixed flowing gas (MFG) consisting of | 10 PPB of chlorine, 10 PPB of hydrogen sulfide, 200 PPB of sulfur | dioxide, and 200 PPB of nitrogen dioxide for 20 days at 70% | relative humidity and 30 degrees Celsius. Use ASTM B-827 | (Standard Practice for Conducting Mixed Flowing Gas | Environmental Tests) as a reference procedure. 5-Remove connectors from MFG, remeasure contact resistance per step 1. Compare resistance to measurements in step 1. Any contact which has a increase of 15 milliohms or greater is a failure. The remaining is for informational purposes and need not go into the standard. Mixed flowing gas tests IEC -20 PPB Chlorine -200 PPB Nitrogen Dioxide -100 PPB Hydrogen Sulfide -75% Humidity and 30 Degrees Celsius -20 days exposure IEEE -10 PPB Chlorine -200 PPB Nitrogen Dioxide -200 PPB Sulfur Dioxide -10 PPB Hydrogen Sulfide -75% Humidity and 30 Degrees Celsius -20 days exposure IBM -3 PPB Chlorine -500 PPB Nitrogen Oxide -300 PPB Sulfur Dioxide -40 PPB Hydrogen Sulfide -70% Humidity and 25 Degrees Celsius -12 days exposure Batelle Labs -No Sulfur Dioxide